Home
|
Sitemap
|
Careers
|
Contact Us
Home
About Us
Our Products
Resources
Projects & Solutions
Our Services
FAQs
Product Inquiry
About NEL
History
Vision, Mission and Values
Management
Investor Relations
Financials
Certification
Awards
Standing
Burners
Gas Burners
Dual Fuel Burners
Oil Burners
Dual Block Burners
Synthetic Thermic Fluids
Therminol 55
Therminol 59
Therminol FF
Pumps
Domestic Pumps
Industrial Pumps
HVAC Pumps
Pressure Pumps / Booster Systems
Waste Water Pumps
MRO Products
Sealing
Packing
Solar Heating Systems
Solar Water Heating
Hot Water Boilers
Hot Water Generators / Hot Water Boilers
Heat Recovery Systems
Heating Systems
Ongoing Projects
Case Studies
Turnkey Projects
Retrofit & Revamp
Facility Management
Articles
News & Views
Usefull Links
AMC / ASC
Spares
O & M Contarct
Utility Consultancy
Energy Audits
Site Assessment and Survey
Feasibility and Detailed Reports
System Studies
Ongoing Projects
Ongoing Projects:
Custom-built designing and sizing for water distribution system at Virar Dairy Plant, Amul Dairy for supply and commissioning of this Grundfos make Hydro-Flow System.
Retrofitting of 2 Nos of Boiler with Baltur Gas Burner at Dairy plant at Ahmedabad.
Retrofitting of 12.0 Lac Kcals /hr Air Heater with Baltur Gas Burner and system at Chemical Factory at Surendranagar
Retrofitting of an Air Heater by 180 Kgs/hr FO fired Baltur Burner at a starch factory in Ahmedabad
Refurbishing and retrofitting of 6 TPH Steam Boiler, with a Baltur make F.O. burner for a Pharmaceutical Industry
Supply of burners and Gas train for 2 TPH & 1.5 TPH Steam Boilers to Uzbekistan
Supply of Hot Water Boiler from Baltur with LPG Fired Burner, Design, manufacturing, supply and installation and commissioning of HWB with calorifier, Boiler room accessories at CIMS, Ahmedabad.
Retrofitting of 4.0 Million Kcals /Hr Thermic Fluid Heater x 3 Nos with Dual Fuel (Heavy Oil/ NG) fired Baltur make, pre-heated combustion air up to 200 Deg.C, Electronic Modulation Burner in a Polyster Industry at Surat
Design, Supply, Installation and commissioning of Custom-built Hydro-MPC system from Grundfos with Control panel and accessories like flow measuring meters, priming devices, for water distribution and Fire Fighting Pump Set at Amul Dairy, Anand.
3 TPH boiler retrofitting with Baltur Make Furnace Oil Burner.
Conversion of Oil Firing System to LPG Firing for Surface Coating Application
Sizing, selection and supply and commissioning of of Hydro-Pneumatic pressure system to Integrated Residential Sheme in Mauritius
Design, manufacturing and supply of Ring Main System suitable for Furnace Oil fired Baltur Burner.
Refurbishing and replacing of Light Oil burners with Furnace Oil Burners of Baltur Make along with Ring Main System for a tractor manufacturing unit.
Commissioning of Furnace Oil fired Baltur Burners for an Auto Parts Industry, for Degreasing, Phosphating Plant, Water Dry-off Oven, Powder Curing Oven,Paint Drying Oven etc.
Design, Manufacturing, supply, construction and commissioning of complete utility systems comprising Hot Water Generator, 70,000 KCals /Hr, Hydro-Pneumatic Pressure Systems-Hydro-2000, Flow: 32 M3/Hr, Calorifier-10000 Ltr capacity, and complete utility / boiler house accessories for a 5 star Hotel project in Arusha, Tanzania
Design, Supply, Installation and commissioning of Custom-built Hydro-MPC system with Grundfos make pumps, Control panel and accessories like flow measuring meters, priming devices, for water distribution at Sumul Dairy, Surat.
Commissioning of 1.5 Millon Kcals / Hr Hot water generator with TBG 150P X 2 Nos at Ankleshwar
Custom-built designing and sizing for water distribution system for Indian Institute Management, Ahmedabad (IIM-A) Old Campus, supply and commissioning of this Grundfos make Hydro-2000 system.
Achievement
News
Articles
Call Us
+91-79-2692-3170
Fax
+91-79-2692-3469
Email
info@nirmalenergy.com
Share
|
Home
|
About Us
|
FAQ
|
Contact Us
|
Careers
|
Privacy Policy
|
Disclaimer
Powered by:
Nirmal Energy
| Designed and developed by:
Info Data Soft Technologies